Joint Project for NEG DC EV Charger
Demands:
As part of its move towards greater EV adoption, the client required a high-power charging solution for vehicles operating from its premises. Vehicles used for project and site operations need to return to the depot between assignments, creating a need for fast, reliable charging with minimal turnaround time. The client therefore required a DC charger capable of supporting its operational schedule without keeping vehicles off the road for extended periods.
Solution:
As a joint project with our partner Charge N Go, NEG Power deployed a 180kW DC charger at the client’s premises. The high-power charging solution enables EVs to recharge efficiently between operations, helping reduce charging-related downtime and supporting the client’s ongoing transition towards more electrified vehicle operations. NEG Power and Charge N Go worked together throughout the deployment, from installation through to commissioning, ensuring the charger was ready for day-to-day use.